Skip to product information
Vesgantti 68" Loveseat Sofa Beige, Comfy Corduroy Couch with Spring Cushion, Modern Sofa with Deep Seat, for Bedroom & Living Room
$344.99
Sale price
$344.99
Regular price
Shipping calculated at checkout.
About This
- FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This loveseat sofa is known for its sturdiness and solidity, with a maximum weight capacity of 772 lbs. Additionally, the sofa couch features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
- Spring Packs Cushion - This sofa couch provides support and a cushioned feel, which improves the overall comfort of the sofa. Springs help absorb the impact of repeated use and prevent the cushions from deteriorating quickly. This extends the life of the office sofa and reduces the need for frequent replacements
- Durable Corduroy Fabric - This corduroy sofa has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The loveseat sofa has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, corduroy couch is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
- Extra Deep Cushion - With 21.3inches deep seat cushion, this comfy couch is designed to offer a large and spacious area for exceptional comfort and support. Its generous size ensures ample space for relaxation, making it an ideal choice for sofa where comfort is a priority. The supportive structure of a deep cushion helps maintain good posture while enhancing the overall sitting experience
- Ergonomic Support Armrests - This corduroy sofa focuses on providing comfort and relaxation by offering a place for the hands to rest. This ergonomic feature ensures that the arms are well-supported, allowing for a more comfortable and relaxing experience while seated. Additionally, the underside of armrest is designed as a curved shape, aesthetically pleasing, but also effective in preventing painful impacts
- Tool-less Easy Assembly - 2/3-seater sofa consists of one package that is recommended to be assembled by two people and takes only 10 minutes. Please be careful not to scratch the sofa when you open the vacuum package. Cushions take 24-48 hours to fully recover due to compressed packaging. So it is not so fluffy and comfortable when you just unpacked it, you can pat the cushion to make it fluffy and feel better
- Sofa Note - The color of this sofa is affected by different light and different monitors and shows a slight color difference, the picture of the sofa has been restored as much as possible to the truest color, please contact us first if you have any questions, we will solve the problem for you
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Seat Depth : 21.3 inches
- Seat Height : 5.5 Inches
- Weight Limit : 772 Pounds
- Seating Capacity : 2
- Product Dimensions : 30"D x 68"W x 35"H
- Item Weight : 75.6 Pounds
- Type : Loveseat
- Color : Beige + Oak Wood