Skip to product information
Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Green
$449.99
Sale price
$449.99
Regular price
Shipping calculated at checkout.
About This
- Accent Chair with Ottoman - This versatile single-seater sofa suits living rooms, bedrooms, or studies, with a sleek design that fits modern and traditional decor. Paired with a movable ottoman, it offers extra comfort for leg support—perfect for reading, watching TV, or unwinding, letting you stretch out and relax
- Ergonomic & Comfortable - The spring cushions of this reading chair with ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
- FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
- Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
- Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Seat Depth : 20.9 inches
- Seat Height : 19.7 Inches
- Product Dimensions : 31.5"D x 38.5"W x 35"H
- Item Weight : 87.3 Pounds
- Color : 38.5" - 1 Seater & Ottoman Green
- Style : Modern
- Special Feature : Back Support, Ergonomic, Removable Ottoman, Space Saving, Upholstered
- Room Type : Bedroom, Dressing Room, Home Theater, Living Room, Office