Skip to product information
Vesgantti 68" Loveseat Sofa with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Sofa Couch with Solid Wood, Modern Office Sofa with Deep Seat for Living Room and Bedroom, Dark Blue
$479.99
Sale price
$479.99
Regular price
Shipping calculated at checkout.
About This
- Sofa with Movable Ottoman - This sofa couch with a movable ottoman offers versatile configurations—turn it into an L-shaped sectional for division or use the ottoman alone as a footrest or extra seat. Flexible for living rooms, apartments, or bedrooms, its practical design and sleek look easily enhance any space, letting you create personalized setups
- FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This loveseat sofa is known for its sturdiness and solidity, with a maximum weight capacity of 772 lbs. Additionally, the sofa couch features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
- Ergonomic & Comfortable - The spring cushions of this corduroy couch absorb the impact of daily use, preventing rapid wear and tear and extending the life of the sofa couch. Its 21.3-inch seat depth shines, providing ample support for both upright and reclining seating, while the matching 26.3-inch ottoman enhances relaxation by providing leg support or additional seating, which together ensure excellent lumbar support and pressure relief, making every moment of relaxation feel relaxed and luxurious
- Durable Corduroy Fabric - This corduroy sofa couch has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The modern couch has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, sectional couch is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
- Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Slight color/size variations may occur due to displays/manual measurements. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions
Overview
- Brand : Vesgantti
- Assembly Required : Yes
- Seat Depth : 21.3 inches
- Seat Height : 5.5 Inches
- Weight Limit : 772 Pounds
- Seating Capacity : 3.0
- Product Dimensions : 56.3"D x 68"W x 35"H
- Item Weight : 105.6 Pounds
- Leg Length : 5.9 Inches
- Type : Loveseat