Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey

Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey

$667.50
Sale price  $667.50 Regular price 
Skip to product information
Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey

Vesgantti 119" L-Shaped Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, Flexible Layout Sofa with Ottoman, Boneless Style, No Assembly Required, Grey

$667.50
Sale price  $667.50 Regular price 
Shipping calculated at checkout.

About This

  • Modular Sectional, Flexible Layout: This modular sectional sofa offers ultimate flexibility for any space. Easily convert it into an L shaped couch, modular couch, sectional couch, or convertible sofa bed. Ideal living room furniture for apartments, bedrooms, and small space sofa setups
  • Oversized Deep Seat Comfort: Experience true cloud couch comfort with this oversized sectional sofa. The deep seat couch design is perfect for lounging, stretching, or relaxing. A cozy living room couch and family sofa for everyday comfort
  • Supportive Spring & Foam Design: Built with sinuous springs and high density foam cushions, this sectional couch provides strong support and comfort. A durable living room sofa, supportive couch, and long lasting sectional sofa that resists sagging
  • Soft & Durable Corduroy Fabric: This corduroy couch features soft textured fabric that is breathable, skin-friendly, and wear-resistant. A great pet friendly couch and durable sofa for homes with kids and pets, combining comfort with modern style
  • Convertible with Movable Ottoman: Includes a movable ottoman to easily create a chaise lounge, L shaped sectional, or sofa bed setup. This convertible couch adapts to your space and works as a multifunctional sofa for relaxing, entertaining, or sleeping
  • No Assembly, Easy Setup: This no assembly couch ships in 4 boxes for easy delivery. No tools required—just unpack and expand. Perfect easy setup couch, modular sectional sofa, and living room furniture upgrade

Overview

  • Brand : Vesgantti
  • Assembly Required : No
  • Seat Depth : 21.7 inches
  • Seat Height : 17.3 Inches
  • Weight Limit : 1200 Pounds
  • Seating Capacity : 4.0
  • Product Dimensions : 79.6"D x 119.3"W x 32.3"H
  • Item Weight : 46 Pounds
  • Type : Sectional
  • Color : 119" - 3 Seater & Ottoman Grey

Goes well with...